Revision history for Perl extension Graph::Timeline

1.3  Sun 17th June 2006
    - Start and end can now be input down to the second level with
      the yyyy-mm-ddThh:mm:ss format. However GraphGD only operates
      at the yyyy-mm-dd level. The new format was introduced for the
      DiagonalGD chart.

1.2  Wed 14th September 2005
	- Realised I needed a change log file